Size grid connection against operations, not maximum charger power.

Grid sizing decisions account for schedules, charger assignment, readiness margins, tariff exposure, and rollout phases before expansion costs are accepted.

Grid limits

Load envelopes

Avoided overbuild checks

What to compare

Uncontrolled charging

The baseline that shows worst-case peak load and charger competition.

Schedule-aware charging

The scenario that aligns energy delivery with next departure and site constraints.

Phase-in variants

The staged rollout view for vehicle growth, charger additions, and grid upgrade timing.

Outputs to request

Planning note

Grid-cost examples and numeric ranges depend on project assumptions and are reviewed before use.