Skip to main content
Integrations

Connect depot systems instead of replacing them.

Integration risk is one of the biggest blockers in depot electrification. Fenexity makes supported standards, repeatable project integrations, and customer-specific integration paths visible before procurement asks.

OCPP-first charger connection

OCPP diagnostics and fault context

Status labels prevent overpromising

Integration categories

Charging systems

OCPP chargers, diagnostics, local controllers, CSMS interfaces, charger-state changes, and fault context.

Fleet operations

Schedules, blocks, dispatch plans, vehicle state of charge, telematics, and OEM APIs.

Energy systems

Meters, grid limits, tariffs, PV, batteries, EMS, and reporting exports.

Compatibility and integration matrix

Compatibility and integration matrix
CategoryStatusCurrent public scope
OCPP chargersSupportedOCPP 1.6, OCPP 2.0.1, and OCPP 2.1 for charger connection, status, diagnostics, fault context, and operational alarm handling.
Telematics / OEM dataProject-specific integrationOEM APIs, telematics feeds, data points, and update intervals are connected per project scope.
Schedules / depot systemsProject-specific integrationSchedule, block, dispatch, and depot-system data are connected per project; VDV standards are especially relevant in bus operations.
Meters / EMS / PV / batteryProject-specific integrationMeters, external EMS platforms, PV, and battery systems are connected according to available signals and control responsibilities.
Reporting exportsSupported / project-specificCSV and API exports are supported. BI exports and ESG formats are defined per target system, data model, and reporting method.