Skip to main content
Technical guide

Know what needs to connect before implementation starts.

Integration risk is one of the largest buying objections. This checklist helps technical teams separate supported standards, reusable project integrations, and customer-specific connectors.

OCPP and CSMS

Schedules and telematics

Meters, EMS, exports

Systems to map

Charging layer

EVSE, CSMS, OCPP version, local controllers, authentication, and remote-control responsibility.

Operations layer

Schedules, dispatch, telematics, vehicle state, duty changes, and exception handling.

Energy and reporting

Meters, grid limits, tariffs, PV/battery signals, EMS, BI exports, and audit requirements.

Integration labels to use

Compatibility status

Named vendors, protocol versions, and support status are shown when compatibility has been reviewed.