Best for Pre-procurement planning Before charger count, charger power, or grid expansion becomes locked into a tender.
Grid-constrained depots When connection capacity, peak-load risk, or utility timelines constrain fleet rollout.
Phase-in decisions When the first depot stage must not block later fleet growth or PV/battery integration.
Core deliverables Data checklist Fleet, route, charger, grid, tariff, site, and system inputs required to build the first model.
View details Scenario comparison Uncontrolled charging, smart scheduling, charger-count variants, grid-limit variants, and readiness impact.
Decision memo Procurement-safe recommendation with assumptions, sensitivity factors, exclusions, and next-step options.
Offer boundary Offer boundary Topic Included Defined during scoping Timeline Working structure for a focused assessment Actual delivery SLA Pricing Quote-based entry point Fixed fee / setup fee / bundled package Inputs Fleet plan, schedules, chargers, grid limit, tariff signals Minimum data-quality threshold Outputs Modelled scenarios, assumptions sheet, recommendation Public numeric ranges
Offer scope Delivery timeline, price basis, and public numeric results depend on the assessment scope and available project data.