Skip to main content
Charging orchestration

Charge around departures, not around charger availability alone.

Fenexity makes charging decisions from the operating schedule outward: when each vehicle returns, when it leaves, how much energy it needs, which charger is available, and what the site can draw from the grid.

Departure-based priorities

Structured alarm response

Manual override and exception visibility

Core workflows

Daily charging plan

Build charging windows from return times, next duties, required energy, charger allocation, and grid limits.

Exception handling

Make delayed returns, charger alarms, missing vehicle data, or changed schedules visible before readiness is at risk.

Dispatcher control

Keep operational override points clear so the system supports dispatch rather than hiding decisions.

Operational reliability

Deployment prerequisites

Clarify the data, charger-control, and system-access requirements needed for reliable depot operation.

Fallback behavior

Keep cloud connectivity, charger-control, and schedule-import fallback paths visible during implementation.