Planning questions
Route and dwell windows
Map arrival, loading, departure, required energy, reserve policy, and operational exceptions.
Power bottlenecks
Separate charger power, grid connection, queueing, and site-layout bottlenecks before investing.
Cost exposure
Test tariff timing, peak charges, local flexibility, and delay risk before promising savings.
Recommended next artifacts
Planning note
Logistics-specific ranges, screenshots, and route archetypes can be added as the resource expands.